PUBLIC HEALTH & IRRIGATION ENGGINEERING DRAWING 4th Exam/Civil/0513/Dec’16

 Duration: 4Hrs.                                                         M.Marks:100
Note: – Attempt any four questions, selecting two questions from each part.

                                   SECTION-A

  1. Draw a plan and section of a manhole. 25
  2. (a) Draw a cross-section of circular masonry sewer. 15
      (b) Draw the cross-section of semi-circular open drain with its foundation. 10
  3. (a) Draw a cross-section of circular RCC sewer. 15
      (b) Draw a detailed section of a floor trap. 10
  4. Draw a detailed plan and cross-section of a septic tank for 10 users. 25

                                   SECTION-B

  5. Draw a cross-section of a strained type tube well. 25
  6. Draw the detailed cross-section and layout plan of canal head regulator. 25
  7. Draw typical cross-section of a lined channel in cutting and partly cutting. 25
  8. Draw the cross-section of diaphragm type earthen dam. 25

Draw a plan and section of a manhole. 25

Draw a cross-section of circular masonry sewer. 15

Draw the cross-section of semi-circular open drain with its foundation. 10

Draw a cross-section of circular RCC sewer. 15

Draw a detailed section of a floor trap. 10

Draw a detailed plan and cross-section of a septic tank for 10 users. 25

PHIED 4th Sem/Civil/0513/Dec 2016 Diploma Paper Click Here

Draw a cross-section of a strained type tube well. 25
6. Draw the detailed cross-section and layout plan of canal head regulator. 25
7. Draw typical cross-section of a lined channel in cutting and partly cutting. 25
8. Draw the cross-section of diaphragm type earthen dam. 25

Draw the cross-section of strainer type tube-well.

Draw the X-section of zoned type earthen dam.

Draw the L-section of lined channel section in full filling.

Draw the cross-section of semi circular and U-shaped open drain with its foundation.

PHIED 4th Sem/Civil/0513/May 2019 Diploma Paper Click Here

PHIED 4th Sem/Civil /0513/May 2019 Diploma Paper

MY YOUTUBE CHANNEL
JK Smart Classes Upload Lecture for Degree classes like B.TECH,M.TECH in any stream like ECE,EE,ME and Civil Engineering
JK SMART CLASSES
JK SMART CLASSES
ER.JASWINDER KUMAR
JK SMART CLASSES
JK SMART LECTURE
ER.JASWINDER KUMAR
Engineering Classes Upload Lecture for Polytechnic Diploma classes in any stream like ECE,EE,ME and Civil Engineering
JK SMART CLASSES
ENGINEERING CLASSES
ER.JASWINDER KUMAR
JK SMART CLASSES
er.jaswinder kumar
Senior Lecturer

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top