Quantity Surveying & Valuation 6th Sem/Civil/Dec 2017 Diploma Paper

Download Previous Year Diploma Paper of Quantity Surveying & Valuation 6th Sem/Civil/Dec 2017 Diploma Paper

Quantity Surveying & Valuation 6th Sem/Civil/Dec 2017 Diploma Question Paper

                                      SECTION-A

Q1. a) Fill in the Blanks.                                             15×1=15 

    a. Units of measurement of brick wall is __________________
    b. No. Of brick in 1cum of brick masonry is _____________________
    c. Bar bending schedule is made to find out quantity of ____________________
    d. Dry material required for 1cum of cement concrete is________ cum
    e. The livable area of a building at any floor is called ________________

b) State the unit of measurement for the following.

    f. Dpc
    g. Plastering
    h. Concrete flooring
     i. Painting
     j. Erthwork
    k. Cement concrete
     l. Wood work in door frames
    m. Railing
     n. Brick work in foundation
     o. Ashlar masonary

                                      SECTION-B

Q2. Attempt any five questions.                                                                    5×6=30   
  a. What is rough cost estimate?
  b. Write a short note on depreciation
  c. Find out the dry material required for 10 cum cement concrete 1:2:4
  d. Write a short note on sinking fund.
  e. What is lump slump contract
  f. What do you understand by specification of works
  g. Write a short note on Role of contractor.
  h. What do you know about Tender form?

                                     SECTION-C

Q3. Attempt any three questions.                                                       3×10=30

   Q3 Find out material for Brick flooring 10 cm thick laid in cement mortar 1:5 over 10 cm thick cement concrete 1:6:18 over 10 cm sand filling.
   Q4. What is contract, Explain different types of contract?
   Q5. A part of road is to be constructed at a uniform rising gradient of 1 in 30. The NS levels are as follows

 

 

If the formation level at RD0 is 60m, Estimate the quantity of earth work for formation width of 10m. The site slope is 1:2 (Vertical: Horizontal) and there is no cross slope.
   Q6. Workout the quantities of the following items from the given drawing :
   (i) Earthwork in excavation.
  (ii) First class brick work in cement mortar in foundation and plinth.
   (iii) 2.5 cm cement concrete DPC
   (iv) Fist class brick work in cement mortar 1:6 in super structure.

Rough cost estimate

Short note on depreciation

Calculate the dry material required for 10 cum cement concrete 1:2:4

Short note on sinking fund.

Lump slump contract

Short note on Role of contractor.

Quantity Surveying & Valuation 6th Sem/Civil/DEC 2017 Diploma Solved Paper Click Here

Quantity Surveying & Valuation 6th Sem/Civil /DEC 2017 Diploma Paper

MY YOUTUBE CHANNEL
JK Smart Classes Upload Lecture for Degree classes like B.TECH,M.TECH in any stream like ECE,EE,ME and Civil Engineering
JK SMART CLASSES
JK SMART CLASSES
ER.JASWINDER KUMAR
JK SMART CLASSES
JK SMART LECTURE
ER.JASWINDER KUMAR
Engineering Classes Upload Lecture for Polytechnic Diploma classes in any stream like ECE,EE,ME and Civil Engineering
JK SMART CLASSES
ENGINEERING CLASSES
ER.JASWINDER KUMAR
JK SMART CLASSES
er.jaswinder kumar
Senior Lecturer

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top