Q1. a) Fill in the Blanks.                                             15×1=15     

    a. The attendance of the laborers’ is recorded daily in _____________
    b. The loss in the value of the property due to structural deterioration is called _________
    c. The amount submitted by contractor as a guarantee of tender is called ____________
    d. Number of bricks required for 1 Cu.m brick masonry is _____________
    e. One bag of cement= ______ kg.  

b) State the unit of measurement for the following:-

    f. White washing
    g. Wash basin (size specified)
    h. Dado
     i. Welding
     j. Half brick wall
    k. Flooring
     l. Drain
    m. Steel work
    n. Glass Panes
    o. Supply of timber

                                      SECTION-B

Q2. Attempt any five questions.                                                                    5×6=30   
  a. Find out the dry material for 1cu.m brick masonry in cement sand mortar 1:5.
b. Define an estimate. Give its importance or objectives. Name the various types of estimate.
c. Write a note on Analyses of rates.
d. Find out the dry material required for 1cu.m cement concrete 1:2:4.
e. What do you mean by tender?
f. Distinguish clearly between preliminary estimate and detailed estimate
g. Explain the principles of valuation.
h. Define contractor. What are essential qualifications of a contractor?
i. Write a short note on depreciation of buildings.

                                     SECTION-C

Q3. Attempt any three questions.                                                       3×10=30

     Q3 Prepare a preliminary estimate of a building having plinth area equal to 2000 sq.m. Given that:-
      (a) Plinth area rate – Rs. 2100/- per sq.
      (b) Extra for Architectural work – 1½% of the building cost.
      (c) Extra for Electrical Installation (10%), + Water supply and sanitary                            installations (6%) = 10+6=16% of the building cost.
      (d) Extra for other services- 8% of the building cost.
      (e) Contingencies and supervision charges 10%.Workout the analyses of rates for cement concrete 1:4:8 in foundation. Labour for 10cu.m cement concrete is 1 mason @ Rs. 450/- per day, 15 mazdor @ Rs. 250/- , 2 Bhisti @ Rs. 200/- per day. Rate of material:- cement bag Rs. 300/-, Sand Rs. 800/- per cu.m, Course aggregate (bazri) 1000/- per cu.m.

Q4. Define valuation. Give the purpose of valuation. State and explain the various method of valuation.

Q5 What is contract? Explain the different type of contract.

Work out the cost of earth work for a portion of a road from Rd 0 to Rd 90 meters from the following dates

Rd

N.S. level

Filling or Banking

0

205.00

210.00

30

205.60

 

60

206.10

 

90

206.90

 

 

The formulation is in a downward gradient of 1 in 30. Formulation width is 10 meters and side slope 2:1(Horizontal: Vertical) Rate of earthwork is Rs. 425.00% cu.m

    Q6 Work out the quantity of following items from the given drawing:-
        1. Excavation for foundation
        2. Cement concrete 1:6:18 in foundation
        3. Mud masonry in foundation and plinth
       4. Mud masonry in super structure

Quantity Surveying & Valuation 6th Sem/Civil/May 2017 Diploma Solved Question Paper

                                      SECTION-A

Q1. a) Fill in the Blanks.                                             15×1=15     

    a. The attendance of the laborers’ is recorded daily in _____________
    b. The loss in the value of the property due to structural deterioration is called _________
    c. The amount submitted by contractor as a guarantee of tender is called ____________
    d. Number of bricks required for 1 Cu.m brick masonry is _____________
    e. One bag of cement= ______ kg.  

b) State the unit of measurement for the following:-

    f. White washing
    g. Wash basin (size specified)
    h. Dado
     i. Welding
     j. Half brick wall
    k. Flooring
     l. Drain
    m. Steel work
    n. Glass Panes
    o. Supply of timber

Calculate the dry material for 1cu.m brick masonry in cement sand mortar 1:5.

Estimate its importance or objectives.

Name the various types of estimate.

Short note on Analyses of rates.

Calculate the dry material required for 1cu.m cement concrete 1:2:4.

Compare between preliminary estimate and detailed estimate

Principles of valuation.

Contractor and essential qualifications of a contractor

Short note on Depreciation and Muster Roll.

Quantity Surveying & Valuation 6th Sem/Civil/May 2017 Diploma Solved Paper Click Here

Quantity Surveying & Valuation 6th Sem/Civil /May 2017 Diploma Paper

MY YOUTUBE CHANNEL
JK Smart Classes Upload Lecture for Degree classes like B.TECH,M.TECH in any stream like ECE,EE,ME and Civil Engineering
JK SMART CLASSES
JK SMART CLASSES
ER.JASWINDER KUMAR
JK SMART CLASSES
JK SMART LECTURE
ER.JASWINDER KUMAR
Engineering Classes Upload Lecture for Polytechnic Diploma classes in any stream like ECE,EE,ME and Civil Engineering
JK SMART CLASSES
ENGINEERING CLASSES
ER.JASWINDER KUMAR
JK SMART CLASSES
er.jaswinder kumar
Senior Lecturer

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top