Download Previous year Diploma Paper of Water Supply & Waste 4th Semester Civil/0514/December 2018 Paper
Water Supply & Waste 4th Semester Civil/0514/Dec 2018 Paper
SECTION-A
Q a). Fill in the Blanks 15×1=15
i. The arrangement made for collection of human excreta in rural sanitation is known as Sanitary System .
ii. As per code of practice, septic tank should have a minimum width of 137 cm.
iii. At ridges __________ Valve is used.
iv. The pipe through which liquid water carrying human excreta flows is called Soil Pipe .
v. Water closet is provided for receiving Human exterment .
vi. Units of turbidity are 5-10 ppm .
vii. G.I. Pipes are used for Distribution of Water .
viii. Smoke test is conducted for House Plumbing .
ix. PH value of portable water is between 6.5 and 8.5
x. P.V.C. pipes are Plastic pipes.
b) State True or False
xi. Scour valves are also known as relief valve. (False)
xii. Safety valve is also called as blow off valve. (True)
xiii. Per capita consumption for domestic use is 135 ltrs. (True)
xiv. The surface sources of water are the sources in which the water flows over the earth’s surface. (True)
xv. The demand of water in houses for washing, bathing, and cooking, sanitary and other purpose is called as commercial and industrial demand of water. (False)
       SECTION-B
Q2. Attempt any Ten questions.                                  10×3=30
  a. Explain turbidity.
  b. What are preventions of water borne diseases?
  c. What are colloidal impurities?
  d. What are requirements of pure water?
  e. What are wet intakes?
  f. Explain open channels?
  g. Explain in brief about A.C. pipes?
  h. What are the principles to be followed in determining yield?
   i. What are the factors which affects the yield of a well?
   j. What are infiltration galleries?
   k. What are the factors affecting run-off?
   l. Write briefly about the fluctuation in rate of water consumption.
        SECTION-C
Q3. Attempt any Three questions.                            3×10=30
    i. What is meant by design period? How is it decided? What is its effect on water supply scheme?
    ii. Explain a) Reservoir intake b) Canal intake c) River intake
    iii. State merits and demerits of using following materials in the conveyance of water.
     a) Cast iron b) Steel c) Concrete
    iv. What is coagulation? Explain dry feeding method of mixing coagulants in water.
The arrangement made for collection of human excreta in rural sanitation is known as Sanitary System .
  Â
As per code of practice, septic tank should have a minimum width of 137 cm.
 Â
At ridges __________ Valve is used.
  Â
The pipe through which liquid water carrying human excreta flows is called Soil Pipe .
  Â
Water closet is provided for receiving Human exterment .
Â
Units of turbidity are 5-10 ppm .Â
 Â
G.I. Pipes are used for Distribution of Water .
 Â
Smoke test is conducted for House Plumbing .
   Â
PH value of portable water is between 6.5 and 8.5
  Â
P.V.C. pipes are Plastic pipes.
 Â
b) State true or false.
True
   Â
Download Previous Year Water Supply and Waste Water Engineering PSBTE Diploma Solved Paper Dec 2018Â Click Here
What is meant by design period? How is it decided? What is its effect on water supply scheme?
Explain a) Reservoir intake b) Canal intake c) River intake
Colloidal impurities
 Â
Requirements of pure water
 Â
wet intakes
 Â
Open channels
 Â
Brief about A.C. pipes?
 Â
Principles to be followed in determining yieldÂ
  Â
Factors which affects the yield of a wellÂ
  Â
 infiltration galleriesÂ
  Â
The factors affecting run-off
  Â
fluctuation in rate of water consumption.
Water Supply and Waste Water Engg WSWWEÂ Civil 4th Semester PSBTE Diploma Solved DEC 2018 Paper Click Here
Design period its effect on water supply scheme
   Â
Explain a) Reservoir intake b) Canal intake c) River intake
    Â
Merits and demerits of using following materials in the conveyance of water.
     Â
a) Cast iron b) Steel c) Concrete
    Â
Coagulation
Dry feeding method of mixing coagulants in water.